Cancelled

Ваша работа была отклонена! Причина:

I need an MEP Design Modification

Design details: Looking for an MEP designer for this modification. Refer to middle plan in the attached cad file showing new kitchen. Wall is being placed in middle to separate into two spaces but allowing access to the existing restrooms. • Existing HVAC is to remain as is. • Gas will need to be connected to outside of building. • New kitchen o New 3 comp sink o New handsink o Grease trap and sample well are existing o New hood (drawings will be provided by hood company o New electrical for kitchen equipment o New mop sink may be required if there isn’t one there already. Other notes: • Upper right hand rooms will be dry storage and office. Ideas for the visual style: None Extra notes: This is for a US based lounge, hence apply NEC, ASHRAE, Sheet Metal and Air Conditioning Contractors' National Association (SMACNA), NFPA, IEEE, etc.

Дополнительная информация

Вакансия: #5867

2577 дней 17ч 42м

Бюджет:

$95

Тип работы:

Одноразовая работа

Рабочее время:

00:00 - 08:00

Требуемые навыки
Автор:

Мобильный:

Не доступно

Выполнить работу

Чтобы подать заявку на эту должность, вы должны сначала войти / зарегистрироваться.

Нажмите здесь учиться Как это работает

Поделитесь и / или пригласите на эту работу.
Часто задаваемые вопросы

Нажмите здесь учиться как работает платформа StartAJob?

Напишите в «Напишите заметку или сообщение клиенту»

У вас уже есть предполагаемая стоимость и время для завершения работы, которую вы выполняете в полях «Время выполнения» и «Запрошенный платеж» или оставьте их пустыми и их можно будет изменить позже.

Если вы можете выполнить эту работу, отправьте своё предложение в форме ниже или если у вас есть какие-либо дополнительные вопросы, вы можете написать их в поле для комментариев и оставить поля «Желаемая зарплата» и «Сроки выполнения» пустыми. Они могут быть определены позже.